top of page

The building

Materialization 2.png

Materialization

For the CU-building, brick strips have been chosen. In this way the building correlates well with the rest of Strijp-S. The columns to support the CU0building are going to be made from steel. This material creates an industrial detail to the building.

Section CU 2.png

Section CU

In this section the ordering of the building is clearly visible. The wooden construction is partly visible in this section.

Floorplan ground floor.png

Floorplan

Ground floor

On the ground floor in Microlab is an arcade located. This is in line with the indoor garden of the CU-building. In the CU-building is also an cafeteria located, open for visitors of Strijp-S and people from Microlab and the CU-building. Furtmore, there is a bicycle storage for the residents of the CU-building. 

Floorplan first floor.png

Floorplan

First floor

On the first floor in Microlab is an open meeting space, with voids to the arcade. In the CU-building, this is the first floor with apartments. 

Floorplan fifth floor.png

Floorplan 

Fifth floor

Floors 5 till 7 are for apartments only. Part of the building is above Microlab. 

Elevation south 3.png

Elevation south

The south elevation gives a clear indication of how the two buildings relate to each other. Also the horizontal alignment is very clear. 

Microlab perspective 2.png

Microlab

This perspective shows the new adaptions made to the west facade of Microlab. The impressive change is the curtain wall. The curtain wall is intergraded to create interaction between Microlab and the CU-building.

interior visualization 2.png

APART

MENTS

© 2020 by Group 10 MultiProject TU/e. Proudly created with Wix.com

bottom of page